Company

Jörg Burzer, Member of the Board of Management of Mercedes-Benz Group AG, Production and Supply Chain and Ergun Lümali, Deputy. Chairman of the Supervisory Board and CHAIRMAN of the GBR of Mercedes-Benz Group AG:
22C0241_010
German: Mercedes-EQ - Production plants für electric vehicles
22C0241_011
English: Mercedes-EQ - Production plants für electric vehicles
22C0241_012
German: Mercedes-EQ - Global production network
22C0241_013
English: Mercedes-EQ - Global production network
22C0241_014
Mercedes-Benz Rastatt plant
22C0241_003
Mercedes-Benz Bremen Plant
22C0241_002
Mercedes-Benz Sindelfingen plant
22C0241_001
Production of the all-electric EQS luxury sedan started last year at Factory 56 at the Mercedes-Benz plant in Sindelfingen. In Factory 56, the S-Class, the Mercedes-Maybach S-Class and the EQS are produced completely flexibly on the same line.
22C0241_005
Mercedes-Benz Kecskemét plant
22C0241_004
Production of the EQS electric sedan has started at Factory 56 at the Mercedes-Benz plant in Sindelfingen – flexible, digital, efficient and sustainable.
22C0241_006
The all-electric EQE business sedan was integrated into ongoing series production at the Mercedes-Benz Bremen plant.
22C0241_007
The Mercedes-Benz Rastatt plant has been producing the all-electric EQA compact model since 2021.
22C0241_009
The Mercedes-Benz plant in Bremen started production of the all-electric EQE a few months ago. Already in May 2019, the EQC (combined power consumption: 21.5 kWh/100 km; CO₂ emissions combined: 0 g/km) was integrated into ongoing series production at the Mercedes-Benz plant in northern Germany.
22C0241_008
Paul Gao
22C0234_01
The Mercedes-Benz eCampus is being built at the Mercedes-Benz Untertürkheim site
22C0208_001
The Mercedes-Benz eCampus is being built at the Mercedes-Benz Untertürkheim site
22C0208_002
The Mercedes-Benz eCampus is being built at the Mercedes-Benz Untertürkheim site
22C0208_003
The Mercedes-Benz eCampus is being built at the Mercedes-Benz Untertürkheim site
22C0208_004
Mercedes-Benz Untertürkheim site
22C0208_100
Battery test bench Kirchheim/Nabern (Germany); Employee connects the battery in cold chamber.
22C0208_101
Mercedes-Benz cell technology center: Mercedes-Benz is already researching and developing battery technologies at the Untertürkheim site.
22C0208_102
Mercedes-Benz cell technology center: Mercedes-Benz is already researching and developing battery technologies at the Untertürkheim site.
22C0208_103
Mercedes-Benz cell technology center: Mercedes-Benz is already researching and developing battery technologies at the Untertürkheim site.
22C0208_104
eATS test benches at the Mercedes-Benz Untertürkheim site.
22C0208_105
Battery module assembly at Mercedes-Benz subsidiary Accumotive in Kamenz
22C0208_106
Battery production at the Mercedes-Benz Untertürkheim site – plant annex Hedelfingen.
22C0208_107
Battery production at the Mercedes-Benz Untertürkheim site – plant annex Hedelfingen.
22C0208_108
Battery production at the Mercedes-Benz Untertürkheim site – plant annex Hedelfingen.
22C0208_109
Battery production at the Mercedes-Benz Untertürkheim site – plant annex Hedelfingen.
22C0208_110
Battery production at the Mercedes-Benz Untertürkheim site – plant annex Hedelfingen.
22C0208_111
The Mercedes-Benz battery factory in Untertürkheim - plant annex Brühl – will soon start assembling battery systems for plug-in hybrids.
22C0208_112
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG) and Winfried Kretschmann (Minister President of Baden-Württemberg) with trainees of Untertürkheim plant.
22C0208_005
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Frank Nopper (Lord Mayor of Stuttgart), Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG), Winfried Kretschmann (Minister President of Baden-Württemberg) and Michael Häberle (Deputy Chairman of the General Works Council of Mercedes-Benz Group AG and Chairman of the Works Council at the Mercedes-Benz Untertürkheim site, from left to right, with trainees of Untertürkheim plant.
22C0208_007
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Frank Nopper (Lord Mayor of Stuttgart), Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG), Winfried Kretschmann (Minister President of Baden-Württemberg) and Michael Häberle (Deputy Chairman of the General Works Council of Mercedes-Benz Group AG and Chairman of the Works Council at the Mercedes-Benz Untertürkheim site, from left to right, with trainees of Untertürkheim plant.
22C0208_006
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Frank Nopper (Lord Mayor of Stuttgart), Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG), Winfried Kretschmann (Minister President of Baden-Württemberg) and Michael Häberle (Deputy Chairman of the General Works Council of Mercedes-Benz Group AG and Chairman of the Works Council at the Mercedes-Benz Untertürkheim site, from left to right, with trainees of Untertürkheim plant.
22C0208_008
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Winfried Kretschmann (Minister President of Baden-Württemberg) with trainees of Untertürkheim plant.
22C0208_009
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG) with trainees of Untertürkheim plant.
22C0208_010
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG) with trainees of Untertürkheim plant.
22C0208_011
Groundbreaking Mercedes-Benz eCampus Stuttgart-Untertürkheim; Ola Källenius (Chairman of the Board of Management of Mercedes-Benz Group AG) and Winfried Kretschmann (Minister President of Baden-Württemberg) with trainees of Untertürkheim plant.
22C0208_012
Loading